Graft'd  /  Guides for the trade  /  Painter and decorator quote template

Guide · UK · Printable template

Painter and decorator quote template

A practical UK guide to pricing decorating work, from measuring a room and working out paint and paper to preparation, labour and payment terms, with a printable quote layout.

Rules checked on GOV.UK, HSE, Citizens Advice and Business Companion on 6 November 2026.

Quick answer

Decorators usually price per room, per m², per roll of wallpaper or per day. To quote, measure each room and list every surface (walls, ceiling, woodwork, doors and windows), decide the preparation and number of coats, work out paint from the coverage printed on the tin and paper from the roll size, then add labour, protection, materials with markup and VAT if you are registered. Write the products, colours, finish and exclusions on the quote.

How decorators usually price a job

Decorators usually price per room for standard rooms, per m² for large or commercial areas, per roll for wallpapering, per item for doors and windows, and per day for preparation-heavy work. Most quotes mix them.

MethodFits jobs likeWatch out for
Per roomStandard rooms you know your times forWrite what is included: walls, ceiling, woodwork and how many coats.
Per m²Large areas, commercial work, exteriorsPrice surfaces that need heavy preparation separately.
Per rollWallpaperingSay who supplies the paper. Large pattern repeats need more rolls.
Per item or metreDoors, windows, skirting, spindlesList them; they take longer than walls.
Per dayOlder properties, heavy preparation, touch-upsState roughly how many days you expect.

How to price decorating a room, step by step

Price a room by measuring every surface, deciding the preparation and coats, working out the materials, then adding labour and extras. Drying time between coats decides how many days the job takes, so count it.

  1. Measure. Walls: the distance round the room times the height. Ceiling: length times width. Count doors and windows and measure the skirting.
  2. Decide the preparation: filling, sanding, caulking, stain block, stripping paper, or a mist coat on new plaster.
  3. Work out the paint. Area times number of coats, divided by the coverage per litre printed on the tin, rounded up to whole tins.
  4. Work out the paper. Use the roll size on the label and the room height, and allow for the pattern repeat.
  5. Add sundries and markup: filler, caulk, tape, sandpaper, rollers and dust sheets.
  6. Work out the labour: preparation, cutting in, each coat, drying time and clearing up.
  7. Add extras and VAT: moving furniture, access equipment, parking, and VAT if you are registered.

Worked example (made-up round numbers, not real prices)

A bedroom with 30 m² of walls, two coats, is 60 m² of painting. If the tin said 12 m² per litre (always use the figure on your own tin), that is 5 litres, so one 5 litre tin. Paint and sundries cost you £80, plus a 20% markup, so £96. Labour is 2 days, and if your own day rate were £150 that is £300. Total before VAT: £396.

Markup and margin

TermHow it is worked outWorked arithmetic (illustration only)
MarkupProfit as a % of what the item cost youCost £100, add 25% markup, sell for £125
MarginProfit as a % of the selling price£25 profit on a £125 sale is a 20% margin

Your own rate = (what you need to earn in a year + your yearly business costs) ÷ the hours or days you can actually bill in a year. Billable time is always less than time worked, because quoting, travel, admin and quiet weeks eat into it. Use your own figures, not someone else's.

VAT

Add VAT only if you are VAT registered. GOV.UK says you must register if your taxable turnover for the last 12 months goes over £90,000, measured on a rolling 12 months rather than your tax year. The standard rate is 20%, but some goods and services carry a reduced or zero rate, so check GOV.UK's VAT rates if you are unsure. If you are not registered, say on the quote that no VAT is charged.

What to include on a decorating quote

A decorating quote should leave no doubt about which surfaces, which products and which colours. That is where most decorating disputes start.

  1. Your details, including your VAT number if you are registered.
  2. A quote number, the date and a valid-until date.
  3. The customer's name and the site address.
  4. The scope, room by room and surface by surface, with the preparation and number of coats.
  5. The product, colour and finish for each surface, or a note that the customer will confirm them before you start.
  6. Who supplies the paint and paper.
  7. What is not included, such as plastering, repairs to blown plaster or moving heavy furniture.
  8. A price breakdown: materials, labour and other costs.
  9. VAT, or a line saying no VAT is charged.
  10. Payment terms, how changes are handled and how to accept.

Extras and variations

Agree on the quote that colour changes after work starts, extra rooms and repairs found during preparation are priced and agreed before you do them.

  • A colour change after the first coat.
  • Blown plaster or cracks that need more than filling.
  • Extra rooms, doors or woodwork added on site.
  • Weather delays on exterior work.

Write each change down with the price and the customer's agreement.

Deposits, payment terms and how long the quote lasts

Put the deposit, any stage payments, the due date for the balance and a valid-until date on every quote. Customers rarely argue with terms they agreed before you started. They argue with terms they first hear about on the invoice.

Deposits and stage payments

How much deposit you ask for is your decision, but tie it to something real, such as paint and wallpaper you are buying for that customer. Citizens Advice tells customers that if a deposit is worth more than the work done so far, they can propose a figure and ask for the difference back, so a deposit that matches what you have spent on their job is easier to defend than a round number. On a whole house or a long exterior job, link stage payments to finished rooms or elevations rather than dates.

When the balance is due

Write the due date in plain words, for example "balance due within 7 days of completion", and say how to pay. If your customer is a business, GOV.UK explains that on late business-to-business payments you can claim interest at 8% plus the Bank of England base rate, plus a fixed sum of £40, £70 or £100 depending on the size of the debt. If no payment date was agreed, the payment counts as late 30 days after the customer gets the invoice or you finish the service, whichever is later.

How long the price stands

There is no fixed rule, so choose a period and write a valid-until date on the quote. Paint and paper prices move, and exterior work depends on the season, so a clear date protects you. Citizens Advice says a trader generally cannot raise an accepted quote just because their own costs have gone up, so that date is what protects you if a customer comes back months later.

Rules decorators should know before quoting

Exterior and stairwell work brings in working at height and scaffolding, and contract work brings in CIS. GOV.UK lists decorating among the construction work CIS covers.

Working at height

HSE explains that the Work at Height Regulations 2005 apply if you are an employer or you control work at height, and that the work must be properly planned, supervised and carried out by competent people, using the right equipment, after assessing the risks. Price the access equipment and the time to set it up safely as their own lines.

Scaffolding on the road or pavement

GOV.UK says you need a licence from the local authority to put up scaffolding or hoarding on a public highway. If the access sits on a pavement, include the time and any fee.

Working for a contractor: CIS and the VAT reverse charge

If you work as a subcontractor for a builder or main contractor, the Construction Industry Scheme will usually apply. GOV.UK says contractors deduct 20% from payments to registered subcontractors, 30% from unregistered ones and nothing for those with gross payment status. The deduction is worked out after taking off VAT and materials the subcontractor paid for, among other items, so show materials as their own line on your quote and invoice.

If you are VAT registered and you work for a VAT-registered contractor who reports the payment under CIS, the VAT domestic reverse charge usually applies: the customer accounts for the VAT to HMRC instead of paying it to you. HMRC's technical guide says the invoice must say "reverse charge" and make clear the customer must account for the VAT. It does not apply to work for householders, or to a customer who has told you in writing that they are an end user or intermediary supplier (GOV.UK guidance).

Put it in writing, and know the cancellation rules

Send every quote in writing and get the acceptance in writing too: a signature, an email reply or an online accept button. Citizens Advice describes a quote as a promise to do the work at an agreed price, and an estimate as the trader's best guess at the cost. If you can see and price the whole job, call it a quote. If part of it cannot be known until you start, say so, and either call it an estimate or quote the known part and list your assumptions.

If you agree the job with a customer in their home, it is usually an off-premises contract. Business Companion, the Chartered Trading Standards Institute's guidance for businesses, says the customer then normally has 14 days to cancel a contract for services, starting the day after the contract was made. If you do not give them the cancellation information, that period can be extended by up to 12 months. To start inside the 14 days, the customer must expressly ask you to in a durable medium such as an email, and if they then cancel they pay for the work done up to that point. Contracts of £42 or less are exempt.

Info, not legal advice. The rules on this page are summarised from the official sources listed at the bottom. Check them, or ask a solicitor or accountant, for your own situation.

Common decorating quote mistakes

Decorators lose money on preparation and on time spent waiting for paint to dry.

  • A per-room price with no list of what is included.
  • Underestimating preparation.
  • Forgetting drying time between coats when counting days.
  • Not stating who supplies paint and which product.
  • Leaving out woodwork, doors and windows.
  • No allowance for moving furniture and protection.
  • Colours agreed by word of mouth.

The printable decorating quote template

Type over the grey fields, delete any lines you do not need, then print it, save it as a PDF or copy it into your own document.

Click any grey field to type over it, then print it, save it as a PDF from the print window, or copy it into Word or Google Docs. Nothing you type is saved or sent anywhere.

[Your business name]
[Your own name, if you trade under a business name]
[Business address]
[Phone]  |  [Email]
VAT registration no: [only if you are VAT registered]
QUOTATION
Quote no: [Q-0001]
Date: [dd/mm/yyyy]
Price valid until: [dd/mm/yyyy]
Prepared for
[Customer name]
[Customer address]
[Phone or email]
Site address
[Where the work will be done, if different]
Scope of work
[Describe each room and surface, the preparation, the number of coats, and the product, colour and finish]
ItemQtyUnit price (£)Amount (£)
Materials
[e.g. Paint: product, colour and finish][tins][0.00][0.00]
[e.g. Wallpaper (if you supply it)][rolls][0.00][0.00]
[e.g. Filler, caulk, sandpaper, tape and sundries][1][0.00][0.00]
Labour
[e.g. Preparation: filling, sanding, stripping][hrs][0.00][0.00]
[e.g. Walls and ceiling, two coats][m² or room][0.00][0.00]
[e.g. Woodwork: doors, frames and skirting][items][0.00][0.00]
Other
[e.g. Protection, moving furniture, access equipment][1][0.00][0.00]
Total excluding VAT£[0.00]
VAT at [rate] (only if VAT registered)£[0.00]
Total price£[0.00]
Not included
[For example: plastering, repairs to blown plaster, moving heavy furniture, colour changes after work starts]
Assumptions and changes
[For example: if we find something that could not be seen at the survey, we will stop, explain it and price it before carrying on. Any extra work is only done once you have agreed the price in writing.]
Payment terms
[For example: deposit of £0.00 on acceptance to cover materials ordered for your job, balance due within 7 days of completion. Payment by bank transfer or payment link.]
Your right to cancel
[If this contract is agreed in your home, give the customer the cancellation information and cancellation form the law requires. See the guidance on this page.]
To accept this quote
Sign and date below, or reply in writing to say you accept.
Signed: ______________________    Name: ______________________    Date: ____________
Business details
[Sole trader: your name and trading name. Limited company: your full registered company name.]

Quote on site with Graft'd

Graft'd is a quoting, invoicing and job app for UK tradespeople. Talk or type the job and it builds the quote with a plain-English scope of works for you to check. Parts are priced from supplier guide prices or your own rates, and it is set up for the way decorators price, per room, per m², per roll or per day. Your customer accepts the quote online, you invoice in one tap and get paid through your own payment link, and Graft'd chases late payers for you. Job notes, photos and receipts stay with the job, and CIS and the VAT reverse charge are handled on invoices.

It runs in your phone's browser, so there is nothing to download from an app store.

Built for the trade, by a tradesman

Quote the room before you leave it

Talk through the rooms and surfaces, check the lines, and send a quote the customer can accept online.

Graft'd is in beta and you can use it today in your phone's browser. No card is needed and nothing is charged until launch on Monday 7 December 2026. Founding members get 35% off for life, with founding places capped at 240 and the offer closing on launch day. From launch, Solo is £29 a month and Business is £49 a month for up to 5 people.

Works for electricians, gas engineers, plumbers, builders, plasterers, decorators, roofers, tilers, landscapers, joiners, window and door fitters and HVAC engineers, plus multi-trade jobs.

Quoting questions, straight answers

How do I price decorating a room?

Measure the walls, ceiling and woodwork, decide the preparation and number of coats, and work out paint from the coverage printed on the tin. Then add your labour, materials with markup, protection and clearing up, and VAT if you are registered.

How much paint should I quote for?

Multiply the area by the number of coats and divide by the coverage per litre printed on the tin, then round up to whole tins. New plaster and big colour changes may need extra coats.

How do I price wallpapering?

Many decorators price hanging per roll. Work out the rolls from the room size and the roll size on the label, allow for the pattern repeat, and say whether you or the customer supplies the paper.

Should I put the colours on the quote?

Yes. Write the product, colour and finish for each surface, or say the customer will confirm them before you start. It stops arguments about what was agreed.

Does CIS apply to decorating work?

GOV.UK lists decorating among the construction work CIS covers. If you subcontract for a contractor, expect deductions of 20% if you are registered or 30% if not, worked out after taking off VAT and materials you paid for.

Is this painter and decorator quote template printable?

Yes. Type over the grey fields, then print it, save it as a PDF from the print window or copy it into Word or Google Docs. Nothing you type is saved or sent anywhere.

Sources

Every rule on this page comes from the official pages below, opened and checked on 6 November 2026. Prices and figures in the worked examples are made up to show the sums; they are not market rates.

This page is general information for UK tradespeople, not legal, tax or accounting advice. Rules change, so check the linked pages or speak to an accountant or solicitor about your own situation.