Quick answer
To quote a plumbing job, survey it and write down exactly what you will fit, move or repair. List every part at the price you pay and add your markup, estimate the labour for each task including draining down, testing and clearing up, then add any call-out, disposal or access costs. Add VAT only if you are VAT registered. Write it up with what is included, what is not, payment terms, a valid-until date and how to accept. Gas work must only be done by a Gas Safe registered engineer.
How plumbers usually price a job
Plumbers usually price in one of three ways: a fixed price per job for work you can see and have done before, an hourly or day rate for fault-finding and work you cannot fully see, or a price per item, such as per radiator or per fitting, added up into a total. Many quotes mix all three, with a call-out charge on reactive work.
| Method | Fits jobs like | Watch out for |
|---|---|---|
| Fixed price per job | Swapping a basin, toilet or tap, fitting a radiator, a bathroom you have surveyed | Hidden pipework and access. Write your assumptions down. |
| Hourly or day rate | Leaks, fault-finding, older systems | Say what the rate covers, when the clock starts, and when you will check in with the customer. |
| Per item | Radiators, valves and fittings on a bigger job | Count draining down, refilling and testing once, not per item. |
| Call-out charge | Reactive and emergency work | Tell the customer before you set off, and say whether it comes off the bill. |
What to include on a plumbing quote
A good plumbing quote answers every question the customer would otherwise ring you about, and it protects you if the job changes once the floor is up. Work through this list.
- Your details. Business name, address, phone and email, plus your VAT number if you are registered.
- A quote number, the date and a valid-until date.
- The customer's name and the site address.
- A plain-English scope of work. Each room, each fitting and each pipe run, in words the customer understands.
- Who supplies what. If the customer is buying their own taps or suite, say so, and say what that means for your guarantee.
- What is not included. Tiling, making good, decorating, boxing in and faults in existing pipework are the usual causes of a row.
- A price breakdown. Parts, labour and other costs such as disposal of old fittings, parking or notification fees.
- VAT, shown clearly, or a line saying no VAT is charged.
- Payment terms and how changes are handled.
- How to accept, and, if the job includes gas work, your Gas Safe registration, since HSE encourages customers to check it.
How to quote a plumbing job, step by step
Price a plumbing job from the bottom up, in the same order every time: survey, parts, markup, labour, extras, then VAT. Working in a fixed order is what stops the small things going missing.
1. Survey the job and confirm the scope
Walk the job and work out where water and waste will run, where the stopcock and isolation valves are, what access there is under floors and behind panels, and what the existing pipework is made of. Take photos and measurements. Write down what you cannot see, because that is where your assumptions go on the quote.
2. List every part at the price you pay
Build the list fitting by fitting: pipe, fittings, valves, clips, traps, wastes, sealant and fixings, plus any sanitaryware or appliances you are supplying. Price it from your own trade account, and get a price for anything you have not bought before rather than guessing.
3. Add your markup, and know it from margin
Markup on parts pays for sourcing, collecting, returns and the risk of a part failing under warranty. Some plumbers build their profit into the labour rate instead. Either way, know the arithmetic:
| Term | How it is worked out | Worked arithmetic (illustration only) |
|---|---|---|
| Markup | Profit as a % of what the item cost you | Cost £100, add 25% markup, sell for £125 |
| Margin | Profit as a % of the selling price | £25 profit on a £125 sale is a 20% margin |
4. Work out all the labour
Break the job into tasks and put time against each one: isolating and draining down, stripping out, first fix, second fix, refilling and bleeding, testing for leaks, commissioning, clearing up, plus travel and any trips for parts. Then price those hours at your own rate.
Your own rate = (what you need to earn in a year + your yearly business costs) ÷ the hours or days you can actually bill in a year. Billable time is always less than time worked, because quoting, travel, admin and quiet weeks eat into it. Use your own figures, not someone else's.
5. Add the extras, then VAT
Disposal of old fittings, parking, access equipment and any building regulations notification are real costs, so give each its own line.
Add VAT only if you are VAT registered. GOV.UK says you must register if your taxable turnover for the last 12 months goes over £90,000, measured on a rolling 12 months rather than your tax year. The standard rate is 20%, but some goods and services carry a reduced or zero rate, so check GOV.UK's VAT rates if you are unsure. If you are not registered, say on the quote that no VAT is charged.
Worked example (made-up round numbers, not suggested prices)
Swapping a basin and taps. Parts cost you £120, plus a 20% markup, so £144. Labour is 3 hours, and if your own rate were £40 an hour that is £120. Disposal of the old basin is £10. Total before VAT: £274. If you are VAT registered at 20%, add £54.80 for a total of £328.80.
Extras, variations and the pipework you cannot see
Put one simple rule on the quote: if you find something that could not be seen at the survey, you stop, explain it, price it and only carry on once the customer agrees. Then write each change down as it happens.
- Corroded pipework or valves that will not shut off.
- Floorboards, tiles or boxing that have to come up to reach a run.
- Problems with the boiler or system that sit outside your scope.
- The customer upgrading taps, a shower or a radiator halfway through.
For each change, keep a short note of what it is, why it is needed, the price, the customer's agreement and the date. A photo makes the conversation easier.
Deposits, payment terms and how long the quote lasts
Put the deposit, any stage payments, the due date for the balance and a valid-until date on every quote. Customers rarely argue with terms they agreed before you started. They argue with terms they first hear about on the invoice.
Deposits and stage payments
How much deposit you ask for is your decision, but tie it to something real, such as a boiler, cylinder or bathroom suite you are ordering for that customer. Citizens Advice tells customers that if a deposit is worth more than the work done so far, they can propose a figure and ask for the difference back, so a deposit that matches what you have spent on their job is easier to defend than a round number. On a full bathroom or a heating system, set out stage payments linked to finished stages, such as first fix complete, rather than to dates.
When the balance is due
Write the due date in plain words, for example "balance due within 7 days of completion", and say how to pay. If your customer is a business, GOV.UK explains that on late business-to-business payments you can claim interest at 8% plus the Bank of England base rate, plus a fixed sum of £40, £70 or £100 depending on the size of the debt. If no payment date was agreed, the payment counts as late 30 days after the customer gets the invoice or you finish the service, whichever is later.
How long the price stands
There is no fixed rule, so choose a period and write a valid-until date on the quote. Prices for parts, sanitaryware and boilers move, and a clear date stops an old price being held against you. Citizens Advice says a trader generally cannot raise an accepted quote just because their own costs have gone up, so that date is what protects you if a customer comes back months later.
Rules plumbers should know before quoting
Three sets of rules affect what goes on a plumbing quote: who may do gas work, when building regulations apply, and how you are paid when you work for a contractor.
Gas work
HSE says anyone employed to work on gas appliances in domestic premises must be a Gas Safe registered engineer, and the engineer's ID card shows which appliances they are qualified to work on. Only quote for gas work your registration covers, and if you are not registered, leave gas work out of the quote altogether.
Building regulations
GOV.UK lists installing a bathroom that involves plumbing, installing or replacing a heating system and adding extra radiators as work that might need building regulations approval. Replacing baths, toilets, basins and sinks does not need approval. If you are registered with a competent person scheme, the customer does not need to get approval themselves. Where notification applies, price the time and any fee on the quote.
Taking waste away
If you take waste away in your van, check your registration. GOV.UK says a business that transports waste in England must register as a waste carrier, and that registration usually costs nothing if you only carry waste you produce yourself. Put disposal on the quote as its own line so the customer can see it.
Working for a contractor: CIS and the VAT reverse charge
If you work as a subcontractor for a builder or main contractor, the Construction Industry Scheme will usually apply. GOV.UK says contractors deduct 20% from payments to registered subcontractors, 30% from unregistered ones and nothing for those with gross payment status. The deduction is worked out after taking off VAT and materials the subcontractor paid for, among other items, so show materials as their own line on your quote and invoice.
If you are VAT registered and you work for a VAT-registered contractor who reports the payment under CIS, the VAT domestic reverse charge usually applies: the customer accounts for the VAT to HMRC instead of paying it to you. HMRC's technical guide says the invoice must say "reverse charge" and make clear the customer must account for the VAT. It does not apply to work for householders, or to a customer who has told you in writing that they are an end user or intermediary supplier (GOV.UK guidance).
Put it in writing, and know the cancellation rules
Send every quote in writing and get the acceptance in writing too: a signature, an email reply or an online accept button. Citizens Advice describes a quote as a promise to do the work at an agreed price, and an estimate as the trader's best guess at the cost. If you can see and price the whole job, call it a quote. If part of it cannot be known until you start, say so, and either call it an estimate or quote the known part and list your assumptions.
If you agree the job with a customer in their home, it is usually an off-premises contract. Business Companion, the Chartered Trading Standards Institute's guidance for businesses, says the customer then normally has 14 days to cancel a contract for services, starting the day after the contract was made. If you do not give them the cancellation information, that period can be extended by up to 12 months. To start inside the 14 days, the customer must expressly ask you to in a durable medium such as an email, and if they then cancel they pay for the work done up to that point. Contracts of £42 or less are exempt. Business Companion also says there is no right to cancel where the customer specifically asked you to call to carry out urgent repairs or maintenance, although other goods or services you sell on the same visit keep that right.
Info, not legal advice. The rules on this page are summarised from the official sources listed at the bottom. Check them, or ask a solicitor or accountant, for your own situation.
Common plumbing quote mistakes
Most underpriced plumbing jobs lose money on the parts of the job that do not feel like plumbing.
- Leaving out draining down, refilling, testing and clearing up.
- Forgetting sundries such as clips, sealant and fixings, or pricing from the shelf rather than your account.
- Not saying who supplies the suite, taps or appliance.
- A vague scope such as "plumbing work to bathroom".
- No valid-until date, so an old price is held against you.
- Mentioning the call-out charge only on the invoice.
- Agreeing extras by word of mouth and never writing them down.
The printable plumber quote template
Type over the grey fields, delete any lines you do not need, then print it, save it as a PDF or copy it into your own document.
Click any grey field to type over it, then print it, save it as a PDF from the print window, or copy it into Word or Google Docs. Nothing you type is saved or sent anywhere.
[Your business name] [Your own name, if you trade under a business name] [Business address] [Phone] | [Email] VAT registration no: [only if you are VAT registered] | QUOTATION Quote no: [Q-0001] Date: [dd/mm/yyyy] Price valid until: [dd/mm/yyyy] |
Prepared for [Customer name] [Customer address] [Phone or email] | Site address [Where the work will be done, if different] |
| Item | Qty | Unit price (£) | Amount (£) |
|---|---|---|---|
| Materials | |||
| [e.g. Basin, taps and waste (if you supply them)] | [1] | [0.00] | [0.00] |
| [e.g. Pipe, fittings, valves, clips and sealant] | [qty] | [0.00] | [0.00] |
| Labour | |||
| [e.g. Isolate, drain down and strip out] | [hrs] | [0.00] | [0.00] |
| [e.g. First and second fix, refill and test for leaks] | [hrs or days] | [0.00] | [0.00] |
| Other | |||
| [e.g. Disposal of old fittings, parking, building regulations notification] | [1] | [0.00] | [0.00] |
| Total excluding VAT | £[0.00] |
| VAT at [rate] (only if VAT registered) | £[0.00] |
| Total price | £[0.00] |
Quote on site with Graft'd
Graft'd is a quoting, invoicing and job app for UK tradespeople. Talk or type the job and it builds the quote with a plain-English scope of works for you to check. Parts are priced from supplier guide prices or your own rates, and it is set up for the way plumbers price, per job, per item or per day. Your customer accepts the quote online, you invoice in one tap and get paid through your own payment link, and Graft'd chases late payers for you. Job notes, photos and receipts stay with the job, and CIS and the VAT reverse charge are handled on invoices. For plumbers and gas engineers it also keeps landlord gas safety and service records.
It runs in your phone's browser, so there is nothing to download from an app store.
Built for the trade, by a tradesman
Quote the job before you leave the house
Talk through the job, check the lines, send it. Your customer can accept it online while you are still packing the van.
Graft'd is in beta and you can use it today in your phone's browser. No card is needed and nothing is charged until launch on Monday 7 December 2026. Founding members get 35% off for life, with founding places capped at 240 and the offer closing on launch day. From launch, Solo is £29 a month and Business is £49 a month for up to 5 people.
Works for electricians, gas engineers, plumbers, builders, plasterers, decorators, roofers, tilers, landscapers, joiners, window and door fitters and HVAC engineers, plus multi-trade jobs.
Quoting questions, straight answers
How do I quote a plumbing job?
Survey the job, list every part at the price you pay plus your markup, estimate the labour for each task including draining down, testing and clearing up, add extras such as disposal, then add VAT if you are registered. Write it up with the scope, exclusions, payment terms and a valid-until date.
Should plumbers charge a call-out fee?
That is your decision. Tell the customer before you set off, including whether the charge comes off the bill if they go ahead and whether evenings or weekends cost more.
Do I need to be Gas Safe registered to quote for gas work?
HSE says anyone employed to work on gas appliances in domestic premises must be a Gas Safe registered engineer, and the ID card shows which appliances they can work on. Only quote for gas work your registration covers.
Does a new bathroom need building regulations approval?
It might. GOV.UK lists installing a bathroom that involves plumbing as work that might need approval, while replacing baths, toilets, basins and sinks does not. If you are registered with a competent person scheme, the customer does not need to get approval themselves.
Can I charge more than my quote if I find a problem?
Only with a good reason. Citizens Advice gives extra work the customer agreed to pay for, or an obvious pricing mistake, as examples. Write your assumptions on the quote and price anything new before you do it.
Is this plumber quote template printable?
Yes. Type over the grey fields, then print it, save it as a PDF from the print window or copy it into Word or Google Docs. Nothing you type is saved or sent anywhere.
Sources
Every rule on this page comes from the official pages below, opened and checked on 6 November 2026. Prices and figures in the worked examples are made up to show the sums; they are not market rates.
- Health and Safety Executive, Gas safety: frequently asked questions
- GOV.UK, Building regulations approval
- GOV.UK, Building regulations approval: when you do not need approval
- Citizens Advice (England), Problem with building work, decorating or home improvements
- Business Companion (Chartered Trading Standards Institute), Consumer contracts: off-premises sales
- GOV.UK, Register for VAT: when to register
- GOV.UK, VAT rates
- GOV.UK, Late commercial payments: charging interest and debt recovery
- GOV.UK, Late commercial payments: interest on late payments
- GOV.UK, Late commercial payments: claim debt recovery costs
- GOV.UK, CIS contractors: make deductions and pay subcontractors
- GOV.UK, How to use the VAT reverse charge if you supply building and construction services
- GOV.UK, VAT reverse charge technical guide
- GOV.UK, Register or renew as a waste carrier, broker or dealer (England)
This page is general information for UK tradespeople, not legal, tax or accounting advice. Rules change, so check the linked pages or speak to an accountant or solicitor about your own situation.